Faulks Road Reconstruction Underway – by Ememanka

An eyewitness Onyebuchi Ememanka reported that he visited Faulks Road Aba to see if reconstruction of the dilapidated road has started and discovered that the Project contractor, SETRACO is doing a good job. They are currently building drainage within the BRASS – OKIGWE ROAD JUNCTION AXIS.

“I spoke to one of the supervising engineers and he told me that the drainage will run on both sides of the road from Brass Junction down to Ariaria Junction at the Expressway after which the real road construction will start.” Ememanka reported.

1 Comment

Leave a Reply